«

»

Nov 08

Quadcopter frame

I have found my pictures that I took during the build of my Quadcopter frame. (I thought I deleted them by mistake)

Drilling mounting holes

Drilling mounting holes

Emco unimat3

Emco unimat3

Drilling motor mount

Drilling motor mount

Big hole to clear axle and washers including circlip

Big hole to clear axle and washers including circlip

measurement of arms

measurement of arms

measurement motor to motor

measurement motor to motor

All layers done

All layers done

All layers done other side

All layers done other side

All layers done other side closeup

All layers done other side closeup

All layers done other side view

All layers done other side view

Here we see that the threaded rods are a bit to long. I ran out of 6mm alloy tube so I could not finish 4 spacers – they are going to be 20mm (the ones in the picture are all 15mm)

20mm is needed to make room for the EDB.

The layers are 95*95mm
The arms are 10*10mm and 300mm long
The cc between mounting holes are 40mm
The threaded rods are M3
Holes to motors are drilled to suit 22-20L and the landing gear

[ad#Google Adsense]

Leave a Reply

Your email address will not be published. Required fields are marked *


*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>